Iain Macdonald the site manager supervising the piling.
The steel casing is driven in to the ground
Excavating around the pilings ready for filing and for the pile caps
Excavation for pile caps completed ready for cutting the casings to the required length.
Pilings cut to the required height and ready to be filled with reinforced concrete.
The piles are filled with reinforced concrete.
Once all the pilings are complete the permanent formwork is laid ready for the ground beams.
The reinforced ground beams are laid and connected to the pile caps, ready to be filled with concrete.
The ground beams are filled with concrete.
The pile cap ready to be filled with concrete with the steel holding down bolts on top.
NRB Construction Management Ltd was formed in 1990 with the specific aim of providing a professional and efficient project management service.
Based in Bradford we are ideally situated to provide service to the rapidly expanding industry along the M62 corridor, and to both North & South via A1/M1 links.
In recent years the organisation has adapted with regards to the changing demands of clients including becoming affiliated with memberships such as Constructionline & Construction Health and Safety Assessment Scheme. The company prides itself on its flexible approach to work within the Project Team enabling completion to the clients satisfaction. This is reflected in the wide range of clients and organisations the company has worked with, which in many cases have resulted in continued long standing relationships.